The PCMRC Garden Railroad was constructed in 2002.
It is a G scale outdoor loop railroad which consist of one loop with
passing sidings, several storage tracks,and a back-and-forth trolley
line.
The club has extensive equipment and buildings for
the railroad and operates it periodically for special events and
celebrations. In November 2007, a track realignment program
was undertaken to create two distinct loops so multiple trains could
be run in different directions. The trolley line was also renovated. The
new operation was tested with a public showing on Thanksgiving Day,
2007.
Tony Gibson is Superintendent of the Garden Railroad.